In the context of the restoration of the trunk road between Palermo and Agrigento affected by geotechnical and structural problems, we’ve been appointed for the detailed design of the structural works connected to the consolidation of the Scorciavacche embankment and reinforced earth walls.
The consolidation consists of concrete pile works with bulk anchors, horizontal drains, etc.
Location | PALERMO – Italy |
Year | 2017 |
Client | Bolognetta ScpA |
Scope of work | Civil Works Detailed design |